glenn bradley
10-26-2008, 06:03 PM
Moving right along (finally). Here's a couple side assemblies, shelf and rear apron. Note the machining for the fig-8 connectors and a spanning brace (more on that in a sec).
25075
All joints are pegged tenons. The shelf is a pegged through tenon and is not glued.
25076
Hang with me a moment, I'll get there . . .
25079
I wanted the drawer front to echo the side and rear aprons in appearance so that meant no frame at the drawer front. I added a spanning brace that will work along with the shelf to keep thing correct over time.
25077
Square, square, square . . . keepin' it square.
25078
Gotta go do the other one before I lose momentum.
25075
All joints are pegged tenons. The shelf is a pegged through tenon and is not glued.
25076
Hang with me a moment, I'll get there . . .
25079
I wanted the drawer front to echo the side and rear aprons in appearance so that meant no frame at the drawer front. I added a spanning brace that will work along with the shelf to keep thing correct over time.
25077
Square, square, square . . . keepin' it square.
25078
Gotta go do the other one before I lose momentum.