    Here is my place in need of finishing. I have a 200 amp service direct to the building. The area inside the building set aside for the shop is 30'wide x 35' long w/ 8and 1/2' ceilings. For now it works, but still need to get the rest of the cabinets built and in place. Still need to hang the insulation and drywall. Then the lumber needs to move behind the wall. Hopefully by next week it will be close to done. http://s78.photobucket.com/albums/j1...ics/?start=all

  2. #2
    Join Date
    Jun 2008
    Location
    Hempstead, Texas
    Posts
    80
    Quote Originally Posted by Al killian View Post
    Here is my place in need of finishing. I have a 200 amp service direct to the building. The area inside the building set aside for the shop is 30'wide x 35' long w/ 8and 1/2' ceilings. For now it works, but still need to get the rest of the cabinets built and in place. Still need to hang the insulation and drywall. Then the lumber needs to move behind the wall. Hopefully by next week it will be close to done. http://s78.photobucket.com/albums/j1...ics/?start=all
    Is the shop on the first floor or second floor?

  3. #3
    Join Date
    Oct 2006
    Location
    Tokyo Japan
    Posts
    15,809
    Yep, that is a "mess in progress" for sure

    It will be nice when you get it all done, I know that can seem a long way off, but take it in small bites and it will get done!

    Nice set of tools you have there too!
    The pessimist complains about the wind; the optimist expects it to change; the realist adjusts the sails.
    William Arthur Ward

  4. #4
    Join Date
    May 2008
    Location
    Deming, NM
    Posts
    42
    Hey Al,

    That will be a nice size shop when it is finished. Here are some shop cabinet ideas. By the way, I have a really old "Milwaukee/Delta" jig saw something like yours.

  5. #5
    Join Date
    Dec 2006
    Location
    Floydada, Tx
    Posts
    1,941
    or now the shop is on the first floor. The second floor is only for finishing and storage. Maybe by next year I will have the beams fixed to put the ceiling back in for the second floor ceiling/ third floor floor. Tommrow, I will have plenty of room to work as the secetary desk and vanity will be going to there homes.

Similar Threads

  1. Another pine mess...
    By Roger Tulk in forum Turning Tool Questions and Show & Tell
    Replies: 5
    Last Post: 06-17-2015, 12:59 PM
  2. One Big Mess:(
    By larry merlau in forum Off Topic Discussion
    Replies: 17
    Last Post: 05-16-2014, 05:10 PM
  3. A Mess of Mills
    By Don Orr in forum Lathe Project Showcase
    Replies: 16
    Last Post: 11-30-2011, 03:35 AM
  4. What a mess
    By Robert Mickley in forum General Woodturning Q&A
    Replies: 10
    Last Post: 02-08-2008, 01:15 AM
  5. I really do know how to make a mess!
    By Don Taylor in forum General Woodworking Q&A
    Replies: 17
    Last Post: 11-28-2007, 09:42 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •