I have to move the vertical pipes shown back about 1" due to the new shower valve being larger than the old one.
I am going to cut the horizontal pipes that you can see running along the floor and move the entire vertical section back, which includes the pipe running up to the shower head. Then splice the horizontal pipes back together.
My question is about the Water. I am going to shut off the water where it comes into the house in the basement, then I am going to turn on the kitchen sink facuet (on the first floor) and drain the water. So...when I cut the pipes there shouldn't be much water that comes out....right???
What about the hot water side?
Thanks for any help, wont be doing this until Friday.
I am going to cut the horizontal pipes that you can see running along the floor and move the entire vertical section back, which includes the pipe running up to the shower head. Then splice the horizontal pipes back together.
My question is about the Water. I am going to shut off the water where it comes into the house in the basement, then I am going to turn on the kitchen sink facuet (on the first floor) and drain the water. So...when I cut the pipes there shouldn't be much water that comes out....right???
What about the hot water side?
Thanks for any help, wont be doing this until Friday.