Karl Brogger
Member
- Messages
- 519
- Location
- Dennison, MN
Almost back online!
Here's the blocks I made for the widebelt to sit on. A bit better looking than just having it sit on some rough 6x6's
Its kinda funny, from straight on it looks like a bigger machine. Almost like a real Timesaver.
Air lines are basically done. I've got one drop I need to hook up, but I need my plumber landlord to sweat a fitting for me. Me doing it, it is sure to be ugly, and leaky.
Total I've got ten drops scattered around the shop. I ended up adding two more, than I originally planned, just for whatever use. Half of them are dedicated to machines. Its going to be so nice not having to shuffle stuff around anymore.
YEAH!!!! My horses and carts are done.
Ten horses, and four carts.
Got Pipe? I ended up ordering everything through McMaster-Carr. Might have been a mistake. I ended up spending basically $2k by the time freight is figured into it.
Got some of it up last night. The other room is going to be a challenge. I'm also concerned I've got too much pipe on the one collector in the other room. There's going to be two tablesaws, two shapers, a planer, and the widebelt all on the one unit.
Here's the blocks I made for the widebelt to sit on. A bit better looking than just having it sit on some rough 6x6's
Its kinda funny, from straight on it looks like a bigger machine. Almost like a real Timesaver.
Air lines are basically done. I've got one drop I need to hook up, but I need my plumber landlord to sweat a fitting for me. Me doing it, it is sure to be ugly, and leaky.
Total I've got ten drops scattered around the shop. I ended up adding two more, than I originally planned, just for whatever use. Half of them are dedicated to machines. Its going to be so nice not having to shuffle stuff around anymore.
YEAH!!!! My horses and carts are done.
Ten horses, and four carts.
Got Pipe? I ended up ordering everything through McMaster-Carr. Might have been a mistake. I ended up spending basically $2k by the time freight is figured into it.
Got some of it up last night. The other room is going to be a challenge. I'm also concerned I've got too much pipe on the one collector in the other room. There's going to be two tablesaws, two shapers, a planer, and the widebelt all on the one unit.