Al killian
Member
- Messages
- 1,940
- Location
- Floydada, Tx
My shop is now in what used to be a veal barn. The barn is 40'Wx100'L. The heated part is going to be 40'x40'. In order to pour concrete we had to bring in alot of fill. Along the one wall there was a 10'x100' strip of concrete that my freinds father put in for the horses. We used 38 tons of recycled concrete to bring the groud up to grade. The great thong about recycled concrete is it packs in like concrete. Here is what it looked like last week. Before the fill went in. Will load more pics tommrow night after we pour.