Frank Pellow
Member
- Messages
- 2,332
- Location
- Toronto, Ontario, CANADA
Here is the floor plan as it has been for about the last four years:
That layout was somewhat cramped but OK until 2011 when I added stained glass
making to the types of work that I undertake in the shed. Now, that place is
away too messy and unorganized. This morning I decided to try a reorg of my
major machines to see if that will help. I'm not quite sure where things will
end up, but I have made a small start by moving the table saw most of the way to
it's new location (which will be about where the planer now sits and
perpendicular to that wall). I will need to change some of the ductwork.
Here are a few photos taken about an hour ago.
If things don't work out, I will replace my jointer and planer with a combo
machine. I did attempt to do that last year but, if I need to
do so, I will make a more serious attempt.
That layout was somewhat cramped but OK until 2011 when I added stained glass
making to the types of work that I undertake in the shed. Now, that place is
away too messy and unorganized. This morning I decided to try a reorg of my
major machines to see if that will help. I'm not quite sure where things will
end up, but I have made a small start by moving the table saw most of the way to
it's new location (which will be about where the planer now sits and
perpendicular to that wall). I will need to change some of the ductwork.
Here are a few photos taken about an hour ago.
If things don't work out, I will replace my jointer and planer with a combo
machine. I did attempt to do that last year but, if I need to
do so, I will make a more serious attempt.
Last edited: