Well, it’s been about 3 weeks, and I’ve dealt with rain, cold, shipping delays, Pneumonia, food poisoning, dark, and work, but not necessarily in that order! In spite of all of this, things are moving along on the shop!
This week, we finally got the inspection on the utility trench, so that is now filled in and packed down, thanks to my contractor and his skid steer! He spent a whopping 1.5 hours doing a job that would have taken me and my little tractor a day to do! Thanks, Rich!
We finally got the proper color siding in, and that job should be finished by the time I get home today. It matches the house exactly, and looks really sharp!
The electrical rough-in was inspected, and except for a couple of minor changes the inspector wanted, that is done.
I ordered the dry wall today (60 sheets) and Lowe's should get that to me by the weekend. So I hope to start hanging the rock on the ceiling on Sunday, and when I get that done, I’ll blow in enough cellulose to rate it at R50.
And the garage door installer is supposed to install the door on Monday. I might move some tools in by Christmas!