- Messages
- 7,986
- Location
- falcon heights, minnesota
got the rest of the chair done today. cut the tenons on all of the spindles, and cut the chamfers on the tops and bottoms of the legs. then it was time for a full assembly. now all that is left, is the finishing.
Attachments
-
019 side spindle tenons.jpg93.7 KB · Views: 13
-
026 ready for finishing.jpg131.7 KB · Views: 16
-
025 front legs in place.jpg112 KB · Views: 12
-
024 side assembly in place.jpg125 KB · Views: 13
-
023 chamfers done and back in place.jpg132.1 KB · Views: 12
-
022 back assembled.jpg117.7 KB · Views: 13
-
021 sides assembled.jpg137.2 KB · Views: 12
-
020 back spindle tenons.jpg99.1 KB · Views: 12