- Messages
- 7,984
- Location
- falcon heights, minnesota
more progress made today. got the drawer pulls assembled and sanded, the holes drilled, dyed the posts, and one fitted to the first drawer. checked the drawer in place, and finished up with adding the coat of seal coat. tomorrow, the posts get the gel stain, and then a couple of coats of shellac, and added to the drawers when finished.
Attachments
-
107 drawer pulls assembled.JPG117.2 KB · Views: 15
-
114 pulls with coat of seal coat.JPG91.9 KB · Views: 13
-
113 drawer in place.JPG91.7 KB · Views: 17
-
112 pull inserted into drawer face.JPG67.5 KB · Views: 11
-
111 pegs inserted into pull.JPG87.8 KB · Views: 12
-
110 holes drilled in drawer face.JPG62.7 KB · Views: 13
-
109 posts dyed.JPG87.8 KB · Views: 12
-
108 holes for pegs drilled.JPG95.5 KB · Views: 13