Stuart Ablett
Member
- Messages
- 15,917
- Location
- Tokyo Japan
Monday, huge headache, with s fever, and I started at 8:30 AM and ended at 10:30 PM.
Not a fun day, but the install went pretty much to plan.
My Micro van is FULL!!
I first leveled the base and then put the side and middle components in place, fits like a glove!!
The cut out for the existing electrical and cable outlets.
Top component in place, it too fit really nice.
The TV is just sat on the bottom cabinet, as there is a problem with mounting it on the wall.
There are no studs in the wall.... the way is made up of sheets of 1/2" drywall pressed into blobs of drywall mud that dots the concrete wall of the building.
At this point I was feeling like death warmed over, and we called it a day.
Stay tuned for the dramatic conclusion!
Sent from my iPhone using Tapatalk
Not a fun day, but the install went pretty much to plan.
My Micro van is FULL!!
I first leveled the base and then put the side and middle components in place, fits like a glove!!
The cut out for the existing electrical and cable outlets.
Top component in place, it too fit really nice.
The TV is just sat on the bottom cabinet, as there is a problem with mounting it on the wall.
There are no studs in the wall.... the way is made up of sheets of 1/2" drywall pressed into blobs of drywall mud that dots the concrete wall of the building.
At this point I was feeling like death warmed over, and we called it a day.
Stay tuned for the dramatic conclusion!
Sent from my iPhone using Tapatalk
Last edited: