Ken Fitzgerald
Member
- Messages
- 2,322
Tonight I finally got my DC about 15 minutes away from being totally completed.
In the first photo is the DC drop for my SCMS
In the 2nd photo is the drop in the middle of my shop for the t/s, b/s, planer and jointer. You can also see the 3rd drop to the right of the DC. It services my lathe during sanding operations.
The 3rd photo is a better view of the middle drop.
The 4th photo is the 3hp Oneida Super Dust Gorilla. That thing really sucks!
I'm now at the point where I can set up my new b/s and start building a lumber rack, assembly table and cabinets for the shop. FInally!
And...........No Nancy....I haven't turned anything except 3 Christmas ornaments since September......but that's fixing to change!
In the first photo is the DC drop for my SCMS
In the 2nd photo is the drop in the middle of my shop for the t/s, b/s, planer and jointer. You can also see the 3rd drop to the right of the DC. It services my lathe during sanding operations.
The 3rd photo is a better view of the middle drop.
The 4th photo is the 3hp Oneida Super Dust Gorilla. That thing really sucks!
I'm now at the point where I can set up my new b/s and start building a lumber rack, assembly table and cabinets for the shop. FInally!
And...........No Nancy....I haven't turned anything except 3 Christmas ornaments since September......but that's fixing to change!
Last edited: