Bartee Lamar
Member
- Messages
- 499
- Location
- Alpharetta GA ( Metro Atlanta)
A very small beginning on my DC piping installation.
My plan is to run 6" Sewer pipe to all my machines. I have alot of the pieces purchased, just sitting and waiting. I am waiting for some extra funds to actually purchase the piping that will be required.
I was messing around and created a 6" port for my jointer ( Grizz G0593). Here is what I ended up with. I am not sure the gate will end up here. I was just experimenting with how the Lee Valley gate fit with a 6" HVAC duct. It does fit exactly.
More about this as I go along with the installation.
Here is the web album showing some of the details.
My plan is to run 6" Sewer pipe to all my machines. I have alot of the pieces purchased, just sitting and waiting. I am waiting for some extra funds to actually purchase the piping that will be required.
I was messing around and created a 6" port for my jointer ( Grizz G0593). Here is what I ended up with. I am not sure the gate will end up here. I was just experimenting with how the Lee Valley gate fit with a 6" HVAC duct. It does fit exactly.
More about this as I go along with the installation.
Here is the web album showing some of the details.
Last edited: