- Messages
- 16,540
- Location
- Reno NV
My motto is to never let a lack of aptitude or skill stop me from trying something!
Onward and upward, or whatevs!
Onward and upward, or whatevs!
well my 11 was on the low side too...Coming along! Looks like you will pass my guess of 14 trips to HD!
I don't know that would mean getting it done in less than 3 weeks, I'm bet'n it'll be more like Christmas.So, I went back and saw the initial post was 11/30/2019. I know he has the week of TG off. I say we all place bets and see if he can get it done in under a year. I'm betting he will, now that the pressure is on.
after 2 trips to the hardware storeWell, The toilet needed to be special ordered with a 10" rough in and wont be here till the 30th, but that should be a quick enough install.
and 4 more trips...lolI figure all the plumbing will be ready this week and just down to new doors and door trim after that.
your a glutton for punishment...Looking good. Can't wait till we start on our master bath.