I may be slow

Darren Wright

Administrator
Staff member
Messages
20,168
Location
Springfield, Missouri
But I did say I'd get to it. The steel beam we had installed a few years ago finally got covered today.

I started with clamping each piece in place to scribe the ceiling contour to them.
20201011_165040.jpg

Basically the top side is fastened to the wood plate above the beam, then the poplar wraps it.
20201011_202944.jpg

I did a 1/4" round overon the bottom edges.
20201011_203014.jpg

Seems a bit strange not seeing it after so long.
20201011_210848.jpg

I did hold out hoping my wife would warm up to the track trolly pulley. :D
20190724_134722crop2.jpg


I have some drywall patching and trim left to do yet. Oh, and paint!
 
Top