- Messages
- 20,160
- Location
- Springfield, Missouri
Counter top guys showed up about 8:30 today and finished up about 11:30.
There is one seam, in this corner, another in middle of where the sink faucet is. I think they did a pretty good job, pretty hard see if you're not looking for them.
This corner we're thinking of doing a piece of 3/4" soapstone on the black cabinet. I thought the new counters were going to be thicker than they are, otherwise I would have just had some matching piece done for them too.
I still need to connect the new kitchen faucet and fasten the dishwasher as they moved the tabs to the side. They could have added a bar across the top under the counter, but said it looks pretty bad with the top controls of the dishwasher.
There is one seam, in this corner, another in middle of where the sink faucet is. I think they did a pretty good job, pretty hard see if you're not looking for them.
This corner we're thinking of doing a piece of 3/4" soapstone on the black cabinet. I thought the new counters were going to be thicker than they are, otherwise I would have just had some matching piece done for them too.
I still need to connect the new kitchen faucet and fasten the dishwasher as they moved the tabs to the side. They could have added a bar across the top under the counter, but said it looks pretty bad with the top controls of the dishwasher.