Mess in progress

Al killian

Member
Messages
1,940
Location
Floydada, Tx
Here is my place in need of finishing. I have a 200 amp service direct to the building. The area inside the building set aside for the shop is 30'wide x 35' long w/ 8and 1/2' ceilings. For now it works, but still need to get the rest of the cabinets built and in place. Still need to hang the insulation and drywall. Then the lumber needs to move behind the wall. Hopefully by next week it will be close to done.:rolleyes: http://s78.photobucket.com/albums/j104/Al_Killian/Shop%20pics/?start=all
 
Here is my place in need of finishing. I have a 200 amp service direct to the building. The area inside the building set aside for the shop is 30'wide x 35' long w/ 8and 1/2' ceilings. For now it works, but still need to get the rest of the cabinets built and in place. Still need to hang the insulation and drywall. Then the lumber needs to move behind the wall. Hopefully by next week it will be close to done.:rolleyes: http://s78.photobucket.com/albums/j104/Al_Killian/Shop%20pics/?start=all

Is the shop on the first floor or second floor?
 
Yep, that is a "mess in progress" for sure :D :thumb:

It will be nice when you get it all done, I know that can seem a long way off, but take it in small bites and it will get done!

Nice set of tools you have there too! :wave:
 
Hey Al,

That will be a nice size shop when it is finished. Here are some shop cabinet ideas. By the way, I have a really old "Milwaukee/Delta" jig saw something like yours.
 
or now the shop is on the first floor. The second floor is only for finishing and storage. Maybe by next year I will have the beams fixed to put the ceiling back in for the second floor ceiling/ third floor floor. Tommrow, I will have plenty of room to work as the secetary desk and vanity will be going to there homes.
 
Top