- Messages
- 6,033
- Location
- Plainwell, Michigan
Been a while since I have posted anything on my kitchen so here goes. Lower boxes done and drawers complete and Installed, upper cabs DONE Now onto the lower cabs doors and the fronts for the drawers. Pics are just a few of the cabs due to a very small shop, they all can not be in there at the same time. There are 11 lower boxes and 12 upper boxes total.
OH and the last pic is a glue up for my sons project, I will let him make a thread of his project, so GET IT IN GEAR JIM
Thanks for looking
Tom
OH and the last pic is a glue up for my sons project, I will let him make a thread of his project, so GET IT IN GEAR JIM
Thanks for looking
Tom
Attachments
-
Base cabs 1.jpg65.6 KB · Views: 132
-
Base cabs 2.jpg50.4 KB · Views: 118
-
Cabs 4.jpg61.6 KB · Views: 134
-
Drawer dovetail 3.jpg46.6 KB · Views: 122
-
Cabs 5.jpg53.1 KB · Views: 129
-
Cabs 6.jpg45.8 KB · Views: 118
-
Cabs 7.jpg52.6 KB · Views: 124
-
Cabs 8.jpg44.2 KB · Views: 116
-
Jims glue-up.jpg66.3 KB · Views: 124
Last edited: