- Messages
- 7,994
- Location
- falcon heights, minnesota
talked with the pastor friend of my wife, and found out what it is he needs built. it turns out to be a lectern for their little church. he said that he needed it in about 10 days. i need to finalize the plans, figure out the cut list and stuff tonight. since rockler is having a sale on cherry during february ($3/bft), cherry it will be, finished with boiled linseed oil and 3 coats of clear shellac. clock is ticking....
Last edited: