Chuck Thoits
Member
- Messages
- 4,045
- Location
- NH
The church a few towns over is having some troubles wit there railing. So we got the nod to build them new ones. The city folks in charge think we should be building it out of this Kleer stuff so we are. I can tell you that this Kleer stuff is easy to work with but I have my reservations about using it.
We are building a 2 x 4 frame out of PT and covering it with 4 x 8 x 1/2 and 4 x 10 x 1/2 sheets of smooth Kleer. Than routing it 5" OC with a v bit to give it the v match look.
The stack of 8 small ones are just under 5 feet long by 3 feet tall. The big ones on the trailer are a tad over 16 feet long by 4 feet tall.
We are building a 2 x 4 frame out of PT and covering it with 4 x 8 x 1/2 and 4 x 10 x 1/2 sheets of smooth Kleer. Than routing it 5" OC with a v bit to give it the v match look.
The stack of 8 small ones are just under 5 feet long by 3 feet tall. The big ones on the trailer are a tad over 16 feet long by 4 feet tall.
Attachments
Last edited: