Well, the first weekend is over and so I figured i would start my actual Shed Thread to show some progress over the next month. "at least that's how long i hope it lasts"
Attached is the before picture. The old shed that had sunken into the ground in the back corner, the door barely closed, and roof was rotted out from the trees. The Trees turned out to be mostly dead so we had a company come in and remove all the trees in the back yard and I tore out the shed a few weeks later.
After the work this weekend i have the crushed stone down and the Skids set and level. Purchased all the PT lumber for the flooring
I'll be cutting them to length tonight, and tommorow night i'll hopefully be able to nail them in place.
The project is getting a little side tracked since my wife origionally wanted a small walkway to the shed so I didn't make a mud pit at the shed door. Well that turned into a 5' wide 41' long brick paver pathway. I didn't order near enough crushed stone for that so i'll need to place another order this week and I'll be spending this next weekend just on that. Hopefully if that gets done I'll place the order early next week for the remaining materials to be dropped off.
Attached is the before picture. The old shed that had sunken into the ground in the back corner, the door barely closed, and roof was rotted out from the trees. The Trees turned out to be mostly dead so we had a company come in and remove all the trees in the back yard and I tore out the shed a few weeks later.
After the work this weekend i have the crushed stone down and the Skids set and level. Purchased all the PT lumber for the flooring
I'll be cutting them to length tonight, and tommorow night i'll hopefully be able to nail them in place.
The project is getting a little side tracked since my wife origionally wanted a small walkway to the shed so I didn't make a mud pit at the shed door. Well that turned into a 5' wide 41' long brick paver pathway. I didn't order near enough crushed stone for that so i'll need to place another order this week and I'll be spending this next weekend just on that. Hopefully if that gets done I'll place the order early next week for the remaining materials to be dropped off.