Keith Gardner
Member
- Messages
- 9
New guy here first post I'm really enjoying all of your projects and suggestions.
The gym at the brand new middle school in my neighborhood had a flood that covered about 60 square feet. Over the summer contractors removed the old floor all 8000 square feet of perfect northern hard rock maple and threw in a dumpster. I was fortunate enough to dive for about 1000 feet for my downstairs. I have been cutting off the nails with my angle grinder, which is much easier than trying to remove them. I have about 450 sq ft stacked so far. I'm not sure if I should plane it or install it and then finish it with a drum sander.
Any ideas are welcome thanks Keith.
The gym at the brand new middle school in my neighborhood had a flood that covered about 60 square feet. Over the summer contractors removed the old floor all 8000 square feet of perfect northern hard rock maple and threw in a dumpster. I was fortunate enough to dive for about 1000 feet for my downstairs. I have been cutting off the nails with my angle grinder, which is much easier than trying to remove them. I have about 450 sq ft stacked so far. I'm not sure if I should plane it or install it and then finish it with a drum sander.
Any ideas are welcome thanks Keith.