Amid all the back pain, there has been a bit of progress at Five Talents.
Last week Kevin the engineer completed his drawing for the septic system. Today Luke the driller came out to drill 9 holes so the perc tests could be done. That will commence over the next few days, I hope. So far everything turned up dry. Some sand. Some various degrees of decomposed granite which is good. Rock down around 17 feet. Quite a few possible meanings here. Will have to wait until the perc tests are done.
On the other hand, after September, there will be new rules in effect for septic systems here. What that means is that a few hundred more square feet of buildable space may be possible. Translation: shop space.
Official mode at the moment? Waiting!
Last week Kevin the engineer completed his drawing for the septic system. Today Luke the driller came out to drill 9 holes so the perc tests could be done. That will commence over the next few days, I hope. So far everything turned up dry. Some sand. Some various degrees of decomposed granite which is good. Rock down around 17 feet. Quite a few possible meanings here. Will have to wait until the perc tests are done.
On the other hand, after September, there will be new rules in effect for septic systems here. What that means is that a few hundred more square feet of buildable space may be possible. Translation: shop space.
Official mode at the moment? Waiting!
Last edited: