Paul Douglass
Member
- Messages
- 4,993
- Location
- S E Washington State
Just to document that I can do some physical labor and I do other things besides wood playing. This is my current project. I finished phase one a few minutes ago, time for a break. This section use to have 5 huge arborvitae bushes in it. They were about 15+ feet tall. I removes them a few weeks ago.
I just finish cutting down the 30 or so that were along this stretch. That was phase 1, now I have to haul the cutting off and clean up. I have to contact the power company and ensure where the underground power line is than I start removing the stumps.
All these arborvitaes were from plants that came up from seed out of a bush my M-I-L had. She transferred each little start to an can and brought them to me to plant, whether I wanted them or not. That was in 1982.
Other than sore muscles this was my only injury. I did wear safety glasses, but took them off once to wipe the sweat off them, turned around and walked into a pine needle on a tree. Doc, says I will servive.
I just finish cutting down the 30 or so that were along this stretch. That was phase 1, now I have to haul the cutting off and clean up. I have to contact the power company and ensure where the underground power line is than I start removing the stumps.
All these arborvitaes were from plants that came up from seed out of a bush my M-I-L had. She transferred each little start to an can and brought them to me to plant, whether I wanted them or not. That was in 1982.
Other than sore muscles this was my only injury. I did wear safety glasses, but took them off once to wipe the sweat off them, turned around and walked into a pine needle on a tree. Doc, says I will servive.
Last edited: