Playing a gig this evening at a local sports bar & grill. Debuting a new (to me) guitar in which I've also replaced the electronics. (To those who care, it's a PRS SE Custom 22 in transparent teal over curly maple. I just installed a set of Seymour Duncan Hotrodded Humbuckers and two coil splitter volume pots with no tone pots. It's a pretty axe...I'll post pics once I get some decent ones.)
Saturday I fly back to LA to begin about 8 or 9 days of packing and purging. I need to uninstall my compressor and airline system, build a pallet for the compressor and get the 650 pound compressor mounted on it, take the extension tables and fence rails off the tablesaw, remove the extension table from the bandsaw, partially disassemble my lathe, remove the clamp rack and wrap up all the clamps in stretch wrap, remove the lumber rack and wrap up a few lumber bundles, and who knows what all else. And in order to do any of it, I've got to move a boatload of other stuff out of the shop so I can have better access to the tools.
In the middle of the following week the Allied Van Lines truck will be showing up to haul it all to NM. As soon as the moving van is loaded, I'll be driving my pickup back to ABQ. It's a little long in the tooth with 240K miles on it, so I'm hoping it's up for an 800 mile trip across the Mojave desert and all of Arizona.
Part of this next week will be spent getting the pickup serviced and prepped for the trip.
And in the midst of all this, I've got to keep up with things at the office via a remote connection. Gonna be a busy next couple of weeks.