Don't know if this realy belongs here since I not doing the work but that OK it does show construction from the groudn up.
We signed the contract Sept 6th and they said it would be 3-4 weeks since they needed to pull pirmits. I guess the building slow down is helping, maybe that will mean that the rest of the construction may go faster then there estimated 4-5 months. The house is 3000 sq.ft with a 3 car attached garage that will serve as a shop until I can get the funds together to build the seperate shop. it is all on one level. Here is the plot plan.
Here is the trenching on on 9/26
And finaly the footings are done on 10/27
We signed the contract Sept 6th and they said it would be 3-4 weeks since they needed to pull pirmits. I guess the building slow down is helping, maybe that will mean that the rest of the construction may go faster then there estimated 4-5 months. The house is 3000 sq.ft with a 3 car attached garage that will serve as a shop until I can get the funds together to build the seperate shop. it is all on one level. Here is the plot plan.
Here is the trenching on on 9/26
And finaly the footings are done on 10/27