Here's my current whole house cabinet, staircase, trim out job I have going.
Cabinets have been in the shop for about a month now. Delivered them yesterday.
Went to install today, and they didn't have all the bath walls painted yet, kitchen electric for dishwasher wasn't done. One floor vent hadn't been changed yet. Floor vents are under the cabinets, which I have to cut the toe kicks out for vent covers. One floor vent was going to be under the dishwasher, so told them they had to move that one.
So with the kitchen being not ready, and only one bath area ready, I started to install one vanity and a towel cabinet in there. Got everything marked for the water lines, drains, then-----------I discovered I had brought every tool except my drill.
I decided it was a wasted trip, so came back home to get ready to leave early in the morning for a funeral.
Maple ply and lumber.
Minwax stain, a mixture of 3 to 1 Early American and Red Mahogany.
I also have the staircase, all base trim to stain, finish, and install.
Build two adjoining cabinets next to a gas fireplace.
Build a fireplace mantel.
Make all the window sills.
A 23' long wall shelf, 12' up in the entrance to the great room, plus some other stuff.
Probably take me another month to wrap this job up.
I have the island stained, finished now, but not delivered.
Cabinets have been in the shop for about a month now. Delivered them yesterday.
Went to install today, and they didn't have all the bath walls painted yet, kitchen electric for dishwasher wasn't done. One floor vent hadn't been changed yet. Floor vents are under the cabinets, which I have to cut the toe kicks out for vent covers. One floor vent was going to be under the dishwasher, so told them they had to move that one.
So with the kitchen being not ready, and only one bath area ready, I started to install one vanity and a towel cabinet in there. Got everything marked for the water lines, drains, then-----------I discovered I had brought every tool except my drill.
I decided it was a wasted trip, so came back home to get ready to leave early in the morning for a funeral.
Maple ply and lumber.
Minwax stain, a mixture of 3 to 1 Early American and Red Mahogany.
I also have the staircase, all base trim to stain, finish, and install.
Build two adjoining cabinets next to a gas fireplace.
Build a fireplace mantel.
Make all the window sills.
A 23' long wall shelf, 12' up in the entrance to the great room, plus some other stuff.
Probably take me another month to wrap this job up.
I have the island stained, finished now, but not delivered.
Last edited: