Chris Hatfield
Former Member (by the member's request)
- Messages
- 380
Mid-weekend update:
I was able to get a truck this morning, so I decided to hit up the lumber yard for some supplies. I used my budget for the next two weeks and went ahead and bought a 1/2 sheet of birch for a bunch of holders. That didn't break the bank, but the two sheets of 3/4 shop birch did.
The 3/4 is going to be for my new main counter and miter saw station. I got all the sides, bottom, and miter shelf out of one sheet. The second sheet will make the top, and I'll have a bunch left over. Went ahead and ran the dados for assembly, and hopefully that will happen tomorrow.
The shop is an even bigger wreck as I've started to disassemble my UTS. Now I'm temporarily down to one surface, and it's full of junk. Fully disassembling the UTS and setting up the new cabinet tomorrow will really help.
I was able to get a truck this morning, so I decided to hit up the lumber yard for some supplies. I used my budget for the next two weeks and went ahead and bought a 1/2 sheet of birch for a bunch of holders. That didn't break the bank, but the two sheets of 3/4 shop birch did.
The 3/4 is going to be for my new main counter and miter saw station. I got all the sides, bottom, and miter shelf out of one sheet. The second sheet will make the top, and I'll have a bunch left over. Went ahead and ran the dados for assembly, and hopefully that will happen tomorrow.
The shop is an even bigger wreck as I've started to disassemble my UTS. Now I'm temporarily down to one surface, and it's full of junk. Fully disassembling the UTS and setting up the new cabinet tomorrow will really help.